English
Norwegian

Mechatronics Innovation Lab (MIL)

Yet another milestone has been passed today in connection with the development and realization of MIL. The tenancy agreement between JBU (owner) and UiA (tenant) was signed by Director for Real Estate, Bjørn Vedal, and the University Director, Seunn Smith Tønnesen, in connection with today’s board meeting at UiA.

The building structure will consist of two buildings with a total of approximately 4500 m2 of lab space and related functions, including a cold-laboratory, robot-lab, High Force test-stand (tensile test) etc. Construction start is proposed April 2016, with completion in spring 2017.

Copyright © 2010-2015 JBU. All rights reserved.

Design: Fundamentet.no | Powered by Makeweb